| Owner:ÝÝ |
|
Washington
Suburban Sanitary Commission |
| Contract:ÝÝ |
|
83
CT 1084 F, Hyattsville, MD |
| Amount:ÝÝ |
|
$500,000 |
| Contact:ÝÝ |
|
W.
F. Wilson, Inc., Ben Moy (443-755-8720) |
| Completion:ÝÝ |
|
Projected
November 2002 |
| Scope:ÝÝ |
|
Three
tunnels totaling 520 LF using 36" Permalok
steel casing under highways & railroad
in silty clays 15' below groundwater table. |
|
| Owner:ÝÝ |
|
NYC
Dept of Environmental Protection |
| Contract:ÝÝ |
|
Newtown
Creek Microtunnel, Brooklyn, NY |
| Amount:ÝÝ |
|
$427,000 |
| Contact:ÝÝ |
|
Piccone/McCullagh,
John Culkin (718-383-3878) |
| Completion:ÝÝ |
|
Projected
October 2002 |
| Scope:ÝÝ |
|
One
390 LF tunnel using 48" Vianini concrete
pipe |
|
| Owner:ÝÝ |
|
NYC
Dept of Design & Construction |
| Contract:ÝÝ |
|
#HED
502, Bronx, NY |
| Amount:ÝÝ |
|
$4.5
million |
| Contact:ÝÝ |
|
NYC
DDC, Bronx Deputy Director, Ahmed Bashjawish,
P.E. (718-365-7486) |
| Completion:ÝÝ |
|
Projected
September 2002 |
| Scope:ÝÝ |
|
One
260 LF tunnel using 70" Permalok steel
casing through mica/schist rock under the
Bronx River.ÝTwo Shafts 70' deep |
|
| Owner:ÝÝ |
|
New
Jersey American Water Company |
| Contract:ÝÝ |
|
IP
99-25, Marshes Bog Brook Crossing for Transmission
Main, Farmingdale, NJ |
| Amount:ÝÝ |
|
$1.1
million |
| Contact:ÝÝ |
|
NJAWC,
Ken Seelig, P.E., (856-672-2805) |
| Completion:ÝÝ |
|
August
2002 |
| Scope:ÝÝ |
|
One
drive 610 LF of 44" OD Permalok Steel
Pipe from 26' deep shaft |
|
| Owner:ÝÝ |
|
Atlantic
County Utilities Authority |
| Contract:ÝÝ |
|
Albany
Avenue Force Main Replacement, Atlantic City,
NJ |
| Amount:ÝÝ |
|
$580,000 |
| Contact:ÝÝ |
|
ACUA,
Gene Petitt, P.E., (609-272-6907) |
| Completion:ÝÝ |
|
June
2002 |
| Scope:ÝÝ |
|
Two
drives totaling 450 LF of 44" OD Permalok
Steel Pipe under active NJDOT highway. |
|
| Owner:ÝÝ |
|
Hamilton
Township Water Pollution Control |
| Contract:ÝÝ |
|
Rt.
130 Sewer Interceptor Replacement, Hamilton
Twp, NJ |
| Amount:ÝÝ |
|
$2.4
million |
| Contact:ÝÝ |
|
Malcolm-Pirnie,
Richard Neuner, P.E., (201-398-4358) |
| Completion:ÝÝ |
|
February
2002 |
| Scope:ÝÝ |
|
Eight
drives totaling 2600 LF of 18" ID Denlok
Clay Pipe, 9 shafts 22' deep |
|
| Owner:ÝÝ |
|
Metropolitan
District Commission, Hartford, CT |
| Contract:ÝÝ |
|
Outfall
Relocation, #99-2, East Hartford, CT |
| Amount:ÝÝ |
|
$5.9
million |
| Contact:ÝÝ |
|
The
MDC, Frank Dellaripa, P.E., (860-278-7850,
x-3645) |
| Completion:ÝÝ |
|
Tunnels
Complete April 2001 |
| Scope:ÝÝ |
|
One
500 LF tunnel using 57" Hobas Pipe under
ConnDOT Route 2. One 300 LF tunnel using 61"
OD Steel Casing Pipe through a flood control
dike. |
|
| Owner:ÝÝ |
|
Continental
Airlines, Newark International Airport, Newark,
NJ |
| Contract:ÝÝ |
|
Terminal
"C" Roadway Reconfiguration |
| Amount:ÝÝ |
|
$400,000 |
| Contact:ÝÝ |
|
Conti
Enterprises, Joe Berkowitz (973-622-0006) |
| Completion:ÝÝ |
|
October
2000 |
| Scope:ÝÝ |
|
One
140 LF tunnel using 57" Hobas Pipe under
a vehicle ramp at Terminal "C". |
|
| Owner:ÝÝ |
|
NYC
Dept of Design & Construction |
| Contract:ÝÝ |
|
#SE-552D,
Crossing Belt Parkway, Queens, NY |
| Amount:ÝÝ |
|
$2.8
million |
| Contact:ÝÝ |
|
NYC
DDC, Queens Deputy Director, Bill Svilar,
PE (718-391-2427) |
| Completion:ÝÝ |
|
December
1999 |
| Scope:ÝÝ |
|
Two
185 LF tunnels using 48" ID, 60"
OD Reinforced Concrete Jacking Pipe under
the Belt Parkway.ÝTunnels are side by side
on 9' centers.ÝTwo shafts15' & 24' deep
with soldier piles and timber lagging.ÝOnly
5' of pipe cover. |
|
| Owner:ÝÝ |
|
Riverbay
Corporation, Bronx, NY |
| Contract:ÝÝ |
|
TES-221,
Microtunneling under the Hutchinson River
Parkway, Co-Op City, Bronx, NY |
| Amount:ÝÝ |
|
$2.9
million |
| Contact:ÝÝ |
|
Andrew
Macko @ Riverbay CorporationÝ (718-320-3107)
John Moore @ Lehrer McGovern Bovis, Inc.Ý
(718-320-3105) |
| Completion:ÝÝ |
|
April
1998 |
| Scope:ÝÝ |
|
Five
240 LF tunnels using 54" ID,Ý 66.5"
ODÝ Reinforced Concrete Jacking Pipe under
the Hutchinson River Parkway. One concrete
jacking pit 30' x 90' x 15' deep (tunnels
are side by side on 15' centers). |
|
| Owner:ÝÝ |
|
Borough
of Sayreville, NJ |
| Contract:ÝÝ |
|
Crossway
Creek Sanitary Sewers & Tunnels |
| Amount:ÝÝ |
|
$3.3
million |
| Contact:ÝÝ |
|
CME
Associates,Ý Dave Samuels, PE or Jay Cornell,
PEÝ (732-727-8000) |
| Completion:ÝÝ |
|
August
1995 |
| Scope:ÝÝ |
|
Two
550 LF tunnels using 40" RC Jacking Pipe
under the Garden State Parkway Two 550 LF
tunnels using 40" RC Jacking Pipe under
the Garden State ParkwayÝOne shaft, 50' deep
used for both tunnels. |
|
| Owner:ÝÝ |
|
NYC
Dept of Environmental Protection |
| Contract:ÝÝ |
|
#SER-002117,
Barry Street, Staten Island, NY |
| Amount:ÝÝ |
|
$1
million |
| Contact:ÝÝ |
|
NYC
Dept of Design & Construction, Richard
Zetterlund, PEÝ (718-391-1905) |
| Completion:ÝÝ |
|
August
1994 |
| Scope:ÝÝ |
|
One
400 LF tunnel using 30" Hobas Pipe installed
under Rt.440 in Staten Island, NY |